Kitchen Ceiling & Mews Work

The kitchen ceiling was reinforced today, in preparation for slabbing. All joists were also treated with a wood preservative:




I also brought power out to the mews and wired a light and sockets. The automatic roller door is to be installed tomorrow.




I had some spare Kingspan board lying about so filled the large gap between the two steel beams: