After a long delay, work has started again on the ground floor; this time on the floor itself. Underfloor heating pipework is being laid out and clipped into place on top of the Insufill/limecrete mix and insulation slabs. A limecrete slab will then be poured on top of the pipework to bring it up to the final level.
The plastic framework that holds the pipes down:
Front room (dining room):
The pipes clipped into place:
Rear adjoining room (kitchen):
Rear hallway:
The pipes are leading under the stairs where they will be connected to manifolds and pump:
The return:
More to come...
Great to have you back!! Ready for the NYE party?
ReplyDelete