The top floor stair window below. You can see the concrete head cemented into place below the red brick:
The inside view of the same window below. This has yet to be reinforced and is currently supported in place:
A reminder below of what it looked like before. And proof that the timber head was doing little in the way of support:
The new bathroom window head:
The waste from the bathroom now cemented in place:
A view of the stairway wall, bathroom on opposite side. Note how this interior wall is in no way adjoined to the external wall:
A view of the top of the stairs, much work to be done!
Wondering at what point you realized that you had a house that was going to suck up a lot more time, energy and money than perhaps you had initially thought... What a lot of work, and years more yet to go before I get to the last entry in this blog!
ReplyDelete