Wednesday, 2 October 2013

External Render Complete

I'll get some day time pictures up of the completed render on the back of the house, as soon as it stops raining! I have to say the finish is spectacular in daylight, it even looks great with flash photography. The render is much whiter in person:






100mm Traditional Half-Round AluTec guttering was added before the final coat, to embed the brackets correctly:



Work continues on the inside, with the main job being the upper stair walls. Including the initial scratch coat, there are three coats of plaster here:








With the plaster taking shape, the huge span of this wall becomes apparent:


An additional light point was added to the wall in the left of this picture:






No comments:

Post a Comment