Saturday, 11 January 2014

Ground Floor Archway

P&K Haigney arrived this morning to begin the removal of the ground floor archway, within the wall that separates the front room from the back room. The kitchen is being located in the rear room, dining room in the front room.

Three hours later and the job was finished (apologies for the poor pictures):


No pinning or lintels/concrete heads were required for the job, as there is a supporting red-brick arch inlaid in the opening.



The space has opened up dramatically!

This job needed to be done ahead of other jobs, as the groundworks and under-floor heating will be going in extremely shortly. Stay tuned!