Wednesday 19 February 2014

Ground Floor Excavation Continues

The digging continues for another day, with good progress being made. The depth of the ground now is approx 24" below the original floorboard height:








From reading several instances online, my feeling is that the concrete slab in the rear room diverted moisture that would otherwise rise up through the floorboards, into the surrounding walls, hence the damp line on the walls and plaster. The lime and red brick that comprises the inner walls is quite damp to the touch:











There is the remainder of a pipe coming from the street, up through the soil in the below picture. Not quite sure what it is yet:



Below the fireplace in the front room:


This excavation has filled a 14 cubic yard skip, a larger one is arriving tomorrow!









1 comment:

  1. Wow, your home is not only gorgeous but also one of the cheeriest homes I've ever seen! Really fantastic job!!!

    House Renovations in Earlsfield

    ReplyDelete