Friday, 5 April 2013

Further Window Work

Work continues on the windows, with all ironmongery being installed including the window fasteners, lifts and eyes.

Window fastener:


Window lifts:


Top floor front windows coming along:



Bathroom window:

The same bathroom window from outside, showing the sash eyes:


Upstairs return window:


And finally the rear of the house:







1 comment:

  1. Thanks for sharing such a great blog... I am impressed with you taking time to post a nice info.
    Windows And Doors Phoenix

    ReplyDelete